Metal blasting prices
Blasting price list change date 09.01.2020
Please confirm via email or fax. All rights reserved for the information provided.
Blasting Standards According to SIS 05 5900 Sa 2 ½ degree grit blasting method, or Sa 2 standard mechanical blasting methods are used.
Cannot be published without attribution. Information is recorded for changes in blasting prices.
You can automatically calculate the weight and prices of steel profiles
Lme steel blasting, npi, npu, hea, heb, ipe steel profile, sheet metal, honeycomb beam, castle beam, angle steel, lama steel and others.
IRON AND STEEL PRODUCTS BLASTING TYPES | RAW MATERIAL (TL/TON) | PROCESSED MATERIAL (TL/TON) |
METAL BLASTING | 00 | 00 |
BLASTING + SHOP PRIMER (25 microns) | 00 | 00 |
BLASTING + RAPID PRIMER (60 microns) | 00 | 00 |
BLASTING + RAPID PRIMER (60 microns) + RAPID PAINT (60 microns) | 00 | 00 |
BLASTING + EPOXY PRIMER (60 microns) | 00 | 00 |
BLASTING + EPOXY PRIMER (60 microns) + EPOXY PAINT (60 microns) | 00 | 00 |
SOLVENT-BASED EPOXY PRIMER PAINT
Description: Solvent-based epoxy resin-based, two-component physically and chemically resistant high-gloss paint. Application: The exterior and interior surfaces of fuel tanks, resistance to salt water, diluted acids and bases, etc. are very high. The paint should be prepared in the proportions given in the mixing ratio. Otherwise, cracking occurs in excess of the hardener, and if it is deficient, it cannot perform its soft mold feature. In addition, it causes problems in drying. The mixed paint should be consumed within 8 hours. After 8 hours, Solvent-Based Epoxy Gloss Paint starts the reaction and begins to freeze. This time decreases as the temperature rises. The given time is based on an average temperature of 25 °C.
Technical Specifications (Paint + Hardener Mixture)
Gloss | High Gloss 50 - 60 Gloss / 60 |
Density at 20 °C Temperature | 1.30 - 1.40 gr / cm³ |
Viscosity at 20 °C Temperature | 100 ± 20 seconds DIN CUP 4 / 20 °C |
Drying at 20 °C Temperature | |
Dust Drying | 45 - 60 minutes |
Touch Drying | 120 - 150 minutes |
Full Drying | 7 Days |
Our blasting prices are + VAT and wholesale prices.
Manufacturing address: Eskişehir cad. Yukarı Kirazca Köyü No:342 Arifiye/SAKARYA
For more price information and various explanations of steel and steel products, you can check the links on the left.
Lme Steel Trapez Sheet Prices / Galvanized Box Profile Prices